<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>JD Locklear &#8211; Allied Fire Protection, Inc.</title>
	<atom:link href="https://alliedfire.net/author/jd/feed/" rel="self" type="application/rss+xml" />
	<link>https://alliedfire.net</link>
	<description>Allied Fire Protection for Business</description>
	<lastBuildDate>Fri, 02 Dec 2016 12:18:14 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://alliedfire.net/wp-content/uploads/2015/05/Allied_Fire_Logo-150x150.jpg</url>
	<title>JD Locklear &#8211; Allied Fire Protection, Inc.</title>
	<link>https://alliedfire.net</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>University of North Carolina at Greensboro Rec Center</title>
		<link>https://alliedfire.net/university-of-north-carolina-at-greensboro-rec-center/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Wed, 09 Nov 2016 19:58:44 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://www.alliedfire.net/?p=2619</guid>

					<description><![CDATA[Recently completed is the UNC-G Recreation Center, located in Greensboro, N.C. &#160;This multi story building was supplied with 1,750 sprinkler heads, multiple risers with Zone Control Assemblies, standpipes, and a vertical in-line fire pump. The project was a joint venture between Skanska, USA &#38; Retenbach Constructors.]]></description>
										<content:encoded><![CDATA[<p style="text-align: center;"><a href="http://alliedfire.net/wp-content/uploads/2016/11/unc-greensboro.jpg"><img fetchpriority="high" decoding="async" width="595" height="335" class="size-full wp-image-2620 aligncenter" alt="unc-greensboro" src="http://alliedfire.net/wp-content/uploads/2016/11/unc-greensboro.jpg" srcset="https://alliedfire.net/wp-content/uploads/2016/11/unc-greensboro.jpg 595w, https://alliedfire.net/wp-content/uploads/2016/11/unc-greensboro-300x169.jpg 300w" sizes="(max-width: 595px) 100vw, 595px" /></a>Recently completed is the UNC-G Recreation Center, located in Greensboro, N.C. &nbsp;This multi story building was supplied with 1,750 sprinkler heads, multiple risers with Zone Control Assemblies, standpipes, and a vertical in-line fire pump. The project was a joint venture between Skanska, USA &amp; Retenbach Constructors.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Campbell University Health Science Buildings</title>
		<link>https://alliedfire.net/campbell-university-health-science-buildings/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Wed, 09 Nov 2016 19:52:44 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://www.alliedfire.net/?p=2612</guid>

					<description><![CDATA[Recently completed in 2016 is the Campbell University Health Science Building, located in Buies Creek, N.C.&#160; These multistory buildings have over 1,200 Sprinkler Heads combined, Two Electric Fire Pumps, Multiple Floor Control Assemblies, and Wet Standpipes. The General Contractor for these projects was T.A. Loving.]]></description>
										<content:encoded><![CDATA[<p style="text-align: left;"><a href="http://alliedfire.net/wp-content/uploads/2016/11/Bldg-1.jpg"><img decoding="async" width="640" height="480" class="size-large wp-image-2640 aligncenter" alt="bldg-1" src="http://alliedfire.net/wp-content/uploads/2016/11/Bldg-1-1024x768.jpg" srcset="https://alliedfire.net/wp-content/uploads/2016/11/Bldg-1-1024x768.jpg 1024w, https://alliedfire.net/wp-content/uploads/2016/11/Bldg-1-300x225.jpg 300w, https://alliedfire.net/wp-content/uploads/2016/11/Bldg-1-768x576.jpg 768w, https://alliedfire.net/wp-content/uploads/2016/11/Bldg-1-285x214.jpg 285w" sizes="(max-width: 640px) 100vw, 640px" /></a></p>
<p style="text-align: center;">Recently completed in 2016 is the Campbell University Health Science Building, located in Buies Creek, N.C.&nbsp; These multistory buildings have over 1,200 Sprinkler Heads combined, Two Electric Fire Pumps, Multiple Floor Control Assemblies, and Wet Standpipes. The General Contractor for these projects was T.A. Loving.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Revolution Mill Building A</title>
		<link>https://alliedfire.net/ctwilson/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Fri, 18 Dec 2015 09:47:39 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2162</guid>

					<description><![CDATA[Revolution Mill Building A: Revolution Mill, Building A is a recently completed Historical Preservation project located in Greensboro, North Carolina. The project has 1,657 sprinkler heads installed to bring the original building space up to current code for future tenant lease space. The General Contractor is C.T. Wilson.&#160; &#160; &#160; &#160; &#160;]]></description>
										<content:encoded><![CDATA[<h3>Revolution Mill Building A:</h3>
<p>Revolution Mill, Building A is a recently completed Historical Preservation project located in Greensboro, North Carolina. The project has 1,657 sprinkler heads installed to bring the original building space up to current code for future tenant lease space. The General Contractor is C.T. Wilson.&nbsp;</p>
<h3>&nbsp;</h3>
<h3>&nbsp;</h3>
<p>&nbsp;</p>
<h3>&nbsp;</h3>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Raleigh Union Train Station</title>
		<link>https://alliedfire.net/joint-venture-projects/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Sat, 04 Jul 2015 13:59:06 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://www.alliedfire.net/?p=2381</guid>

					<description><![CDATA[Under construction is the Raleigh Union Train Station project, located in Raleigh, North Carolina. The project will have approximately 525 sprinkler heads, and be equipped with a wet system riser with multiple Zone Control Assemblies, all supplied from a Vertical in-line Fire Pump. This is a Joint Venture Project between General Contractors Clancy &#38; Theys <a href="https://alliedfire.net/joint-venture-projects/" rel="nofollow"><span class="sr-only">Read more about Raleigh Union Train Station</span>[&#8230;]</a>]]></description>
										<content:encoded><![CDATA[<p>Under construction is the Raleigh Union Train Station project, located in Raleigh, North Carolina. The project will have approximately 525 sprinkler heads, and be equipped with a wet system riser with multiple Zone Control Assemblies, all supplied from a Vertical in-line Fire Pump. This is a Joint Venture Project between General Contractors Clancy &amp; Theys Construction Company and Skanska USA.</p>
<p><a href="http://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlatformArrival-373x266.jpg"><img decoding="async" class="alignnone size-medium wp-image-2598" src="http://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlatformArrival-373x266-300x214.jpg" alt="rus-perspplatformarrival-373x266" width="300" height="214" srcset="https://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlatformArrival-373x266-300x214.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlatformArrival-373x266.jpg 373w" sizes="(max-width: 300px) 100vw, 300px" /></a><a href="http://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlazaStairEntry-373x266.jpg"><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-2599" src="http://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlazaStairEntry-373x266-300x214.jpg" alt="rus-perspplazastairentry-373x266" width="300" height="214" srcset="https://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlazaStairEntry-373x266-300x214.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/RUS-PerspPlazaStairEntry-373x266.jpg 373w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a></p>
<p><a href="http://alliedfire.net/wp-content/uploads/2015/07/PIC.jpg"><img loading="lazy" decoding="async" class="alignnone size-large wp-image-2622" src="http://alliedfire.net/wp-content/uploads/2015/07/PIC-1024x768.jpg" alt="pic" width="640" height="480" srcset="https://alliedfire.net/wp-content/uploads/2015/07/PIC-1024x768.jpg 1024w, https://alliedfire.net/wp-content/uploads/2015/07/PIC-300x225.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/PIC-768x576.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/07/PIC-285x214.jpg 285w, https://alliedfire.net/wp-content/uploads/2015/07/PIC.jpg 1280w" sizes="auto, (max-width: 640px) 100vw, 640px" /></a></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Holy Name of Jesus Cathedral</title>
		<link>https://alliedfire.net/clancyandtheys-2/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Fri, 03 Jul 2015 15:13:31 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2264</guid>

					<description><![CDATA[Under construction is the Holy Name of Jesus Cathedral, located in Raleigh, North Carolina. The project will have approximately 450 sprinkler heads, with the highest sprinkler roughly 148 feet above finished floor. The Project will be equipped with multiple wet system risers supplied from a Vertical in-line Fire Pump. The General Contractor is Clancy &#38; <a href="https://alliedfire.net/clancyandtheys-2/" rel="nofollow"><span class="sr-only">Read more about Holy Name of Jesus Cathedral</span>[&#8230;]</a>]]></description>
										<content:encoded><![CDATA[<p>Under construction is the Holy Name of Jesus Cathedral, located in Raleigh, North Carolina. The project will have approximately 450 sprinkler heads, with the highest sprinkler roughly 148 feet above finished floor. The Project will be equipped with multiple wet system risers supplied from a Vertical in-line Fire Pump. The General Contractor is Clancy &amp; Theys Construction.</p>
<p>&nbsp;</p>
<p><a href="http://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set.jpg"><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-2616" src="http://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set-300x225.jpg" alt="march-2016-dome-set" width="300" height="225" srcset="https://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set-300x225.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set-768x576.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set-1024x768.jpg 1024w, https://alliedfire.net/wp-content/uploads/2015/07/March-2016-Dome-Set-285x214.jpg 285w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a> <a href="http://alliedfire.net/wp-content/uploads/2015/07/up-close.jpg"><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-2617" src="http://alliedfire.net/wp-content/uploads/2015/07/up-close-300x225.jpg" alt="up-close" width="300" height="225" srcset="https://alliedfire.net/wp-content/uploads/2015/07/up-close-300x225.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/up-close-768x576.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/07/up-close-1024x768.jpg 1024w, https://alliedfire.net/wp-content/uploads/2015/07/up-close-285x214.jpg 285w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Stanhope 2</title>
		<link>https://alliedfire.net/clancyandtheys/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Fri, 03 Jul 2015 14:51:21 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2235</guid>

					<description><![CDATA[&#160; Recently completed&#160; is &#160;a student housing project and parking deck near&#160; N.C. State University, entitled Stanhope 2 ,and included the following: &#160;6,375 Sprinkler Heads, a 500 g.p.m. Electric Fire Pump, multiple wet and dry pipe systems, a Manual Dry Standpipe, Combined Standpipe Riser with Zone Control Assemblies, and Roof Hydrants. This project&#8217;s General Contractor <a href="https://alliedfire.net/clancyandtheys/" rel="nofollow"><span class="sr-only">Read more about Stanhope 2</span>[&#8230;]</a>]]></description>
										<content:encoded><![CDATA[<h3>&nbsp;</h3>
<p>Recently completed&nbsp; is &nbsp;a student housing project and parking deck near&nbsp; N.C. State University, entitled Stanhope 2 ,and included the following:</p>
<p>&nbsp;6,375 Sprinkler Heads, a 500 g.p.m. Electric Fire Pump, multiple wet and dry pipe systems, a Manual Dry Standpipe, Combined Standpipe Riser with Zone Control Assemblies, and Roof Hydrants.</p>
<p>This project&#8217;s General Contractor was Clancy &amp; Theys Construction Co.</p>
<h3 style="text-align: center;"><a href="http://alliedfire.net/wp-content/uploads/2015/07/Valentine-2-main-578x3251.jpg"><img loading="lazy" decoding="async" class="alignnone size-medium wp-image-2593" src="http://alliedfire.net/wp-content/uploads/2015/07/Valentine-2-main-578x3251-300x169.jpg" alt="valentine-2-main-578x3251" width="300" height="169" srcset="https://alliedfire.net/wp-content/uploads/2015/07/Valentine-2-main-578x3251-300x169.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/Valentine-2-main-578x3251.jpg 578w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a>&nbsp;<a href="http://alliedfire.net/wp-content/uploads/2015/07/Valentine-main-2.jpg"><img loading="lazy" decoding="async" class="size-full wp-image-2592 alignleft" src="http://alliedfire.net/wp-content/uploads/2015/07/Valentine-main-2.jpg" alt="valentine-main-2" width="300" height="221"></a></h3>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Durham City Center</title>
		<link>https://alliedfire.net/armada-hoffler/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Fri, 03 Jul 2015 14:37:41 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2228</guid>

					<description><![CDATA[Under construction is the Durham City Center project, located in Durham, North Carolina.&#160;This project will be a 28 story mixed-use building with office and residential space, and will have approximately 5,000 sprinkler heads installed.&#160; It will be equipped with a wet system riser, high pressure floor control assemblies, standpipes, and an Electric Fire Pump. The <a href="https://alliedfire.net/armada-hoffler/" rel="nofollow"><span class="sr-only">Read more about Durham City Center</span>[&#8230;]</a>]]></description>
										<content:encoded><![CDATA[<p><a href="http://alliedfire.net/wp-content/uploads/2015/07/DurhamCityCenter.jpg"><img loading="lazy" decoding="async" width="388" height="480" class="size-full wp-image-2601 aligncenter" alt="durhamcitycenter" src="http://alliedfire.net/wp-content/uploads/2015/07/DurhamCityCenter.jpg" srcset="https://alliedfire.net/wp-content/uploads/2015/07/DurhamCityCenter.jpg 388w, https://alliedfire.net/wp-content/uploads/2015/07/DurhamCityCenter-243x300.jpg 243w" sizes="auto, (max-width: 388px) 100vw, 388px" /></a></p>
<p>Under construction is the Durham City Center project, located in Durham, North Carolina.&nbsp;This project will be a 28 story mixed-use building with office and residential space, and will have approximately 5,000 sprinkler heads installed.&nbsp; It will be equipped with a wet system riser, high pressure floor control assemblies, standpipes, and an Electric Fire Pump. The project&#8217;s General Contractor is Armada Hoffler. &nbsp;</p>
<p>&nbsp;</p>
<h3>&nbsp;</h3>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Dillon Tower</title>
		<link>https://alliedfire.net/danis/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Thu, 02 Jul 2015 02:05:48 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://www.alliedfire.net/?p=2380</guid>

					<description><![CDATA[Under construction is the Dillon Tower project located in Raleigh, North Carolina.&#160;This high rise building will be mixed-use with office and retail space, and will have approximately 2,250 sprinkler heads installed.&#160; The building will be equipped with a Wet System Riser, Floor Control Assemblies, Standpipes, and an Electric Fire Pump. The project General Contractor is <a href="https://alliedfire.net/danis/" rel="nofollow"><span class="sr-only">Read more about Dillon Tower</span>[&#8230;]</a>]]></description>
										<content:encoded><![CDATA[<p><a href="http://alliedfire.net/wp-content/uploads/2015/07/DillonSupplyBldg.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2602 aligncenter" src="http://alliedfire.net/wp-content/uploads/2015/07/DillonSupplyBldg-300x257.jpg" alt="2015-12-10 Rendering.indd" width="300" height="257" srcset="https://alliedfire.net/wp-content/uploads/2015/07/DillonSupplyBldg-300x257.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/07/DillonSupplyBldg-768x657.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/07/DillonSupplyBldg.jpg 1000w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a>Under construction is the Dillon Tower project located in Raleigh, North Carolina.&nbsp;This high rise building will be mixed-use with office and retail space, and will have approximately 2,250 sprinkler heads installed.&nbsp; The building will be equipped with a Wet System Riser, Floor Control Assemblies, Standpipes, and an Electric Fire Pump. The project General Contractor is Barnhill Construction Company.&nbsp;</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Paul J. Rizzo Building Addition</title>
		<link>https://alliedfire.net/shelco/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Wed, 24 Jun 2015 20:41:16 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2046</guid>

					<description><![CDATA[Recently completed is the Paul J. Rizzo Conference Center Building Addition, located in Chapel Hill, N.C.&#160; The building is supplied by a Wet Pipe System, Four Dry Pipe Systems, Wet Standpipe with Roof Hydrants, and 1,134 sprinkler heads. The General Contractor was Shelco, LLC.]]></description>
										<content:encoded><![CDATA[<p><a href="http://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo.jpg"><img loading="lazy" decoding="async" width="300" height="300" class="size-medium wp-image-2583 aligncenter" alt="paul-j-rizzo" src="http://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-300x300.jpg" srcset="https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-300x300.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-150x150.jpg 150w, https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-768x768.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-1024x1024.jpg 1024w, https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-250x250.jpg 250w, https://alliedfire.net/wp-content/uploads/2015/06/Paul-J.-Rizzo-174x174.jpg 174w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a></p>
<p>Recently completed is the Paul J. Rizzo Conference Center Building Addition, located in Chapel Hill, N.C.&nbsp; The building is supplied by a Wet Pipe System, Four Dry Pipe Systems, Wet Standpipe with Roof Hydrants, and 1,134 sprinkler heads. The General Contractor was Shelco, LLC.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Campbell University South Residence Hall</title>
		<link>https://alliedfire.net/taloving/</link>
		
		<dc:creator><![CDATA[JD Locklear]]></dc:creator>
		<pubDate>Mon, 15 Jun 2015 13:46:25 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">http://alliedfire.venue.ws/?p=2333</guid>

					<description><![CDATA[Under Construction is the Campbell University South Residence Hall, located in Buies Creek, North Carolina.&#160; This building will be a multi story Student Housing building with approx. 900 sprinkler heads and an Electric Driven Fire Pump. The General Contractor for this project is T.A. Loving Company.]]></description>
										<content:encoded><![CDATA[<p><a href="http://alliedfire.net/wp-content/uploads/2015/06/Campbell-University.jpg"><img loading="lazy" decoding="async" width="300" height="225" class="size-medium wp-image-2610 aligncenter" alt="campbell-university" src="http://alliedfire.net/wp-content/uploads/2015/06/Campbell-University-300x225.jpg" srcset="https://alliedfire.net/wp-content/uploads/2015/06/Campbell-University-300x225.jpg 300w, https://alliedfire.net/wp-content/uploads/2015/06/Campbell-University-768x576.jpg 768w, https://alliedfire.net/wp-content/uploads/2015/06/Campbell-University-1024x768.jpg 1024w, https://alliedfire.net/wp-content/uploads/2015/06/Campbell-University-285x214.jpg 285w" sizes="auto, (max-width: 300px) 100vw, 300px" /></a></p>
<p>Under Construction is the Campbell University South Residence Hall, located in Buies Creek, North Carolina.&nbsp; This building will be a multi story Student Housing building with approx. 900 sprinkler heads and an Electric Driven Fire Pump. The General Contractor for this project is T.A. Loving Company.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
